Fire compartmentation works together with other fire safety measures as part of a layered fire strategy, where each layer addresses a different aspect of fire risk. Passive measures like compartmentation contain fire and smoke by construction; active systems like sprinklers and detection respond to fire as it develops. Together, they form a coherent building fire safety strategy rather than a set of alternatives.
For architects and specifying engineers, understanding how these layers interact is essential for designing a fire strategy that is both technically sound and defensible under scrutiny. The sections below address the most common questions about how fire compartmentation fits into the broader picture of building fire safety.
What is the difference between active and passive fire protection?
Active fire protection systems require a trigger or action to operate: they respond to fire. Passive fire protection is built into the structure of the building and works continuously without any activation. The distinction is fundamental to understanding how a complete fire safety strategy is assembled, and the two categories are designed to complement each other rather than substitute for one another.
Active systems include sprinklers, smoke detectors, fire alarm panels, and suppression systems. These systems detect a fire event or respond to it dynamically. A sprinkler head activates when the temperature at its location reaches a defined threshold; a detection system triggers an alarm when smoke or heat is sensed. Their effectiveness depends on working components, correct installation, and maintenance.
Passive fire protection, by contrast, is structural. It encompasses fire-resistant walls, floors, ceilings, and door assemblies that are designed to maintain their performance for a defined period without any activation signal. A fire-rated door does not need to detect anything: it is closed, and it holds. This is why passive protection is often described as the last line of defence: it performs even when active systems fail, are not yet triggered, or are overwhelmed.
For architects working on industrial and commercial projects, both categories appear in the fire strategy document and must be coordinated from the early design stage. The classification of passive elements, including fire-resistant doors, is determined by the building’s compartmentation design, not by the presence or absence of active systems alone.
Need advice for your project?
Discuss your requirements for fire-rated doors, burglar-resistant roller shutters or a suitable solution with Metacon-Next.
How does fire compartmentation limit the spread of fire and smoke?
Fire compartmentation limits the spread of fire and smoke by dividing a building into enclosed zones bounded by fire-resistant construction elements. When a fire starts in one compartment, these boundaries are designed to contain it for a defined period, preventing flames, hot gases, and smoke from spreading to adjacent areas. This buys time for evacuation, limits structural damage, and reduces the scale of the incident.
The boundaries that define a compartment are formed by rated walls, floors, ceilings, and the openings within them. Every opening in a compartment boundary, whether for a door, a duct, or a pipe penetration, is a potential weak point. For the compartment to perform as designed, each opening must be closed by an element that carries the same or equivalent fire resistance classification as the surrounding construction.
Smoke is often the more immediate life-safety risk in a fire, spreading faster than flames and causing incapacitation well before structural failure. Smoke resistance is a separate performance criterion from fire resistance, tested under EN 1634-3 rather than EN 1634-1, and classified separately under EN 13501-2. A door may carry a fire resistance classification without a smoke control classification, or it may carry both. Architects specifying compartment boundaries need to establish which performance criteria are required for each opening, as the answer depends on the compartmentation design for that specific building.
In large industrial buildings such as logistics centres and production halls, the scale of the compartments and the size of the openings required for operational use make compartmentation design particularly complex. The permitted size of a fire compartment is not a fixed number: it is determined through a fire safety calculation that takes into account the building’s use, its construction, and the fire safety measures installed within it.
How do fire doors fit into a compartmentation strategy?
Fire doors are the closures that maintain the integrity of compartment boundaries at every opening that must remain accessible during normal operations. Without certified fire-rated door assemblies at those openings, the compartment boundary is incomplete, regardless of how well the surrounding walls and floors are constructed. A fire door is therefore not an accessory to the compartmentation strategy: it is a structural component of it.
The fire resistance classification of a door is expressed under EN 13501-2 and combines performance criteria with a duration. The three primary criteria relevant to industrial fire doors are E (integrity: flames and hot gases are stopped), W (radiation reduction: limits radiant heat transfer, which is the Dutch standard baseline criterion), and I (insulation: limits temperature rise on the unexposed face). The I criterion is always specified as either EI1 (stricter) or EI2 (less strict), never as a generic EI without the suffix, because the two criteria represent meaningfully different performance levels.
Common classifications include EW60, EW90, EW120, EI1 60, EI2 90, and EI1 120, among others. Which classification is required for a specific opening depends on the compartmentation design for that building, not on a general rule tied to building type. A fire safety engineer or the competent authority determines the required classification through a project-specific calculation.
For industrial applications, the operational requirements of the building add further complexity. Openings sized for forklift traffic, goods movement, or equipment access regularly exceed the dimensions that standard door solutions address. Fire-rated roller curtains, overhead doors, and sliding doors are engineered specifically for these large industrial openings. Metacon-Next’s fire-rated industrial door range includes roller curtains, roller doors, overhead doors, sliding doors, and pedestrian doors, each tested and classified under EN 13501-2 and CE-marked under both EN 16034 and EN 13241.
A critical point for architects is that a fire door is a tested assembly, not a component. The classification applies to the door leaf, frame, hardware, seals, and installation configuration as a system. Changing any element, including exceeding the tested dimensions, can invalidate the classification unless the change falls within the extended application rules defined under EN 15269. Architects should request the classification report alongside the CE declaration of performance at the specification stage to confirm which dimensions and configurations are covered.
Does fire compartmentation replace sprinklers or detection systems?
No. Fire compartmentation does not replace sprinklers or detection systems, and active systems do not replace compartmentation. Each layer of a fire strategy addresses different risks and failure scenarios. Removing any layer creates gaps that the remaining measures cannot fully compensate for, and the appropriate combination for a specific building is determined through its fire safety design.
Compartmentation provides passive, always-on containment. It does not detect fire, suppress it, or alert occupants. Sprinkler systems can suppress or control a fire before it reaches the compartment boundary, potentially reducing the demand placed on passive elements. Detection and alarm systems enable early evacuation and can trigger automatic closing of fire doors. These functions are complementary, not interchangeable.
In some regulatory frameworks and project contexts, the presence of a sprinkler system may influence the fire safety calculation in ways that affect compartment sizing or the required fire resistance duration of passive elements. However, this is not a simple trade-off where one system substitutes for another. The interaction between active and passive measures is assessed as part of the project-specific fire safety design, and any such equivalence must be established by a qualified fire safety engineer, not assumed from general guidance.
For architects, the practical implication is that the fire strategy must document all layers together. A compartmentation drawing that does not account for the active systems present (or a specification that assumes sprinklers reduce passive requirements without engineering substantiation) creates risk at the permit and inspection stage.
What documentation do architects need to specify fire-rated assemblies?
To specify a fire-rated door assembly with confidence, architects need three categories of documentation: the CE declaration of performance, the classification report, and, where relevant, an Environmental Product Declaration. These documents together confirm what the product has been tested for, under which conditions, and within which dimensional limits the classification applies.
The CE declaration of performance is the manufacturer’s formal declaration that the product meets the requirements of the Construction Products Regulation. For industrial fire doors, CE marking is mandatory for market access in the EU and is required for tenders, permit applications, and insurance documentation. CE marking for industrial fire doors involves two standards simultaneously: EN 16034, which covers the fire and smoke-resistant closing function, and EN 13241, which applies to industrial doors generally. Both are relevant and should not be treated as alternatives.
The classification report is the underlying test document from an accredited fire safety laboratory. It specifies the exact fire resistance classification achieved, the dimensions tested, the installation configuration, and the hardware used. Critically, it also defines the extended application range, the EXAP limits, within which the classification can be applied to untested but similar configurations. If a specified opening exceeds those limits, the classification cannot be applied without a separately tested or assessed solution. Architects who request only the CE certificate without the classification report cannot verify whether their specified opening dimensions fall within the tested range.
The EPD, or Environmental Product Declaration, is increasingly required in projects pursuing BREEAM or LEED certification and in European tenders with sustainability criteria. An EPD is a standardised document quantifying a product’s environmental impact across its lifecycle, based on ISO 14044 and EN 15804. It is an information document, not an environmental label or sustainability award. Metacon-Next published EPDs for eleven of its main product lines in 2025, covering products including the RGT, RGS, RGC, OHD-C, and LD Pro ranges, making this documentation available at the specification stage.
The most common documentation problem in practice is late-stage paperwork. Architects who request classification reports and CE documentation only after a product order has been placed lose the ability to verify compliance before commitment. The specification stage is the correct point to confirm that all required documentation exists and covers the actual opening dimensions and configuration being designed.
Need advice for your project?
Discuss your requirements for fire-rated doors, burglar-resistant roller shutters or a suitable solution with Metacon-Next.
When does a compartmentation strategy require more than the regulatory minimum?
A compartmentation strategy requires more than the regulatory minimum when the project deviates from standard building regulations, when sector-specific rules impose additional requirements, or when client or insurer requirements go beyond the statutory baseline. The regulatory minimum, set in the Netherlands by the BBL, the Besluit Bouwwerken Leefomgeving, is the floor, not the ceiling, and many projects are built to a higher standard for identifiable reasons.
There are four main reasons a heavier classification than the baseline may be required:
- Project deviation from standard regulations: When a building deviates from the standard regulatory situation, for example, through a compartment size that exceeds what the standard configuration permits, a heavier fire resistance classification may be required as part of the equivalence calculation.
- Sector-specific regulation: Certain industries are subject to regulations that set stricter fire safety requirements than the general building code. PGS15, which governs the storage of packaged hazardous substances, is one example that can mandate a heavier door classification for chemical storage applications.
- Client requirements: A client or principal may specify above-statutory requirements based on operational risk assessment, insurance conditions, or corporate safety standards. These requirements are binding regardless of what the BBL sets as a minimum.
- Insurer requirements: Insurers underwriting industrial facilities increasingly set their own fire safety conditions as a prerequisite for coverage. These conditions may specify minimum fire resistance durations or particular performance criteria that exceed the regulatory baseline.
What this means in practice is that the BBL does not prescribe a single fixed classification for a given building type or use. The applicable requirement for any specific opening is the result of a project-specific fire safety calculation that takes all of these factors into account. Architects who treat the regulatory minimum as the automatic answer for every project risk under-specifying passive elements and creating compliance problems at the permit or inspection stage.
For projects where the required classification is uncertain, particularly in complex industrial environments or buildings subject to sector regulation, the correct course is to work with a qualified fire safety engineer who can perform or review the compartmentation calculation. Metacon-Next’s product range covers a wide span of classifications, from EW60 through to EI1 120 and beyond, meaning that once the required classification is established, a certified solution can be identified. Architects can contact Metacon-Next directly to discuss technical requirements and confirm which products and documentation apply to a specific project scenario.
Building fire safety is most robust when passive and active measures are designed together from the outset, with each element specified to a level that reflects the actual risk profile of the building, not just the minimum the regulations permit. For fire-rated industrial door assemblies that carry full technical documentation and are available at the specification stage, explore Metacon-Next’s certified product range or request a quotation tailored to your project requirements.
Related Articles
- How does a fire-rated sliding door work in a logistics facility?
- When does a fire door comply with the Building Decree (BBL) in 2026?
- Can a fire door be custom-made for a non-standard industrial opening?
- How do insurers assess fire door compliance in industrial buildings?
- What is a fire-rated high-speed door and when is it used?