Between a fire test and CE marking of a fire-rated door, a structured sequence of technical and administrative steps must be completed: the door is tested under EN 1634-1, the results are classified under EN 13501-2, a classification report is issued by an accredited body, extended application rules are applied to define the certified size range, and a Declaration of Performance is prepared before the CE mark can be affixed. This process transforms a single laboratory test into a product that can legally be placed on the market, backed by documented, traceable evidence. The sections below unpack each stage and explain what architects and specifiers need to understand about the documentation it produces.
What does a fire resistance test actually measure?
A fire resistance test measures how long a closed door assembly maintains defined performance criteria when exposed to a standardised fire curve. The test is conducted under EN 1634-1 and produces results expressed as E, W, EI1, or EI2 classifications under EN 13501-2, each describing a different aspect of the door’s behaviour during fire exposure.
The three performance criteria assessed are:
- E — Integrity: the door prevents flames and hot gases from passing through to the unexposed side.
- W — Radiation reduction: the door limits radiant heat transfer through its surface. W is the Dutch standard baseline criterion and appears in classifications such as EW60 or EW120.
- I — Insulation: the door limits temperature rise on the unexposed face. This criterion splits into two distinct levels: EI1, the stricter criterion with a lower permitted temperature rise, and EI2, which permits a higher temperature rise on the unexposed side. These are not interchangeable: an EI1 60 and an EI2 60 door carry the same fire resistance duration but differ meaningfully in their insulation performance.
The number appended to the classification (30, 60, 90, 120, or 240) indicates the duration in minutes for which the door maintained those criteria during the standardised test. A door classified EW120, for example, maintained integrity and limited radiant heat transfer for 120 minutes under test conditions. Whether that classification is sufficient for a specific compartmentalisation requirement depends on the project’s fire safety calculation, not on the classification alone.
Need advice for your project?
Discuss your requirements for fire-rated doors, burglar-resistant roller shutters or a suitable solution with Metacon-Next.
Who carries out fire door testing and how is it accredited?
Fire resistance testing for doors must be conducted by an accredited notified body, a laboratory that has been formally designated to carry out conformity assessment under the EU Construction Products Regulation (CPR). Notified bodies are assigned unique identification numbers, which appear in the certificate numbers of the products they certify.
Metacon-Next’s products are tested by Efectis, an internationally accredited fire-safety testing and certification organisation. Efectis report numbers appear directly on Metacon-Next’s classification reports: for example, report 2020-Efectis-R001930 underpins the RGS EW 120 roller door classification, and report 2020-Efectis-R000946 supports the OHD-C EI1 60 / EI2 90 / EW 90 overhead door. These reference numbers allow architects and specification writers to trace a product’s classification directly back to its test evidence.
The notified body number also appears in the CE certificate number. Metacon-Next certificates issued through notified body 1812 carry the prefix 1812-CPR-, while the LD Pro pedestrian door certificate, issued through notified body 1396, carries the prefix 1396-CPR-. This traceability is not incidental: it is a structural requirement of the CPR framework and gives the person specifying or approving the product a clear audit trail back to the accredited test.
What is a classification report and why does it matter?
A classification report is the formal document issued by the notified body after testing, recording the test conditions, results, and the fire-resistance classification that those results support. It is the technical foundation beneath the CE mark: without it, the classification has no accredited basis.
For architects, the classification report is not just background paperwork. It contains information that directly affects specification decisions:
- The exact opening dimensions that were physically tested.
- The installation configuration used during the test, including frame type, substrate, and hardware.
- The extended application (EXAP) range within which the classification remains valid for untested dimensions.
- The specific criteria achieved (E, W, EI1, or EI2) and for how many minutes.
An architect specifying a fire-rated door cannot rely on a generic product drawing and assume it applies across all classifications or sizes. The drawing must correspond to the configuration described in the classification report for the stated classification. Requesting the classification report at the specification stage, not after an order is placed, is the professional standard. If a manufacturer cannot supply it before commitment, that is a meaningful signal about the completeness of their documentation.
Metacon-Next publishes classification reports openly for its product range, including Efectis report 2021-Efectis-R001703 for the RGS EI1 30 / EI2 60 roller door and 2020-Efectis-R001582 for the SGC EI1 60 / EW 120 sliding door. Having these available at the specification stage allows a permit file to be closed without chasing documentation later. You can review the full Metacon-Next product range alongside its supporting technical documentation.
How does extended application (EXAP) expand a tested classification?
Extended application, known as EXAP, is the set of rules defined under EN 15269 that allow a fire-resistance classification established through a single test to be applied to door configurations that were not individually tested, provided those configurations fall within defined limits of size, construction, and hardware.
A door tested and classified as EI1 60 retains that classification for any configuration within its EXAP range. This matters practically because it is neither feasible nor necessary to physically test every possible dimension a manufacturer might supply. EXAP rules define how far the tested result can be extrapolated: for example, how much larger an opening can be while still carrying the same classification.
The critical constraint for architects is this: if the specified opening exceeds the EXAP range defined in the classification report, the classification can no longer be applied to that configuration. The door may still be physically available at that size, but it would not carry the stated fire-resistance classification. In that situation, the architect must either seek a separately tested configuration, request manufacturer documentation confirming a different assessed route, or revise the opening dimensions.
This is one of the most common sources of late-stage documentation problems on industrial projects, where large operational openings, sized for forklift access, goods transport, or equipment movement, regularly push against or beyond standard EXAP limits. Confirming the EXAP range against the specified opening at the design stage, not at tender return, prevents the classification from being invalidated on site.
What is the difference between a classification report and a CE declaration of performance?
A classification report and a CE Declaration of Performance (DoP) are two distinct documents that serve different functions in the certification chain. The classification report is the test evidence; the Declaration of Performance is the manufacturer’s formal legal declaration of what the product achieves, based on that evidence.
The classification report is produced by the notified body following accredited testing. It is an objective technical record of what happened in the test laboratory. The DoP is produced by the manufacturer; it declares the product’s performance characteristics and takes legal responsibility for those declarations under the EU Construction Products Regulation. CE marking cannot be applied to a product without a DoP.
For a specifier, the practical difference is this:
- The classification report tells you what was tested, how, and under which conditions; it is the document that lets you verify the classification is real and applicable to your configuration.
- The Declaration of Performance is the manufacturer’s formal commitment to those performance characteristics; it is the document required for placing the product on the EU market and is the reference point for permit documentation and insurance files.
Both documents are necessary. A DoP without an underlying classification report cannot be independently verified. A classification report without a DoP does not satisfy the CPR’s market placement requirements. Architects building a complete specification file need both, and should request them together at the earliest stage of product selection. Contact Metacon-Next if you need confirmation of which documents are available for a specific product configuration.
Need advice for your project?
Discuss your requirements for fire-rated doors, burglar-resistant roller shutters or a suitable solution with Metacon-Next.
What can go wrong between testing and CE marking?
Several gaps can emerge between a completed fire test and a valid CE marking, and each represents a risk to the specifier if it is discovered late in the project lifecycle. The most significant risks are dimensional mismatch, documentation gaps, configuration drift, and classification misidentification.
Dimensional mismatch beyond the EXAP range
As noted above, if the specified opening exceeds the extended application range defined in the classification report, the classification cannot be applied. This is not a manufacturing defect; it is a documentation and specification problem. The door may be fabricated and delivered, but it cannot legally carry the stated classification for that opening. Catching this requires checking the classification report against the specified dimensions before the specification is finalised, not after delivery.
Configuration changes that invalidate the tested assembly
A fire-resistant door is a tested system, not a collection of interchangeable components. The classification applies to the specific combination of door leaf, frame, hardware, seals, and installation method described in the classification report. If any element is substituted (a different frame profile, a different threshold seal, a different glazing insert), the tested assembly is no longer what is being installed. Whether that substitution affects the classification depends on the EXAP rules and the manufacturer’s technical assessment. Assuming it does not is a risk that sits with the specifier.
These two failure modes share a common cause: treating the CE mark as a product label rather than as the end point of a traceable technical chain. A CE mark on a fire-rated door is only as reliable as the classification report and DoP behind it. Metacon-Next addresses this directly by making its full documentation package (classification reports, Declarations of Performance, and EPDs published in 2025) available at the specification stage, so that architects working on logistics centres, production halls, and other industrial facilities can verify the entire chain before committing to a product. For projects where the documentation needs to be reviewed in detail, the quotation process is the right starting point for confirming which reports apply to the specified configuration.
Understanding this chain (from accredited test through classification report, EXAP assessment, and Declaration of Performance to CE marking) is what allows an architect or facility manager to specify a fire-rated door with confidence and defend that choice to a building inspector, insurer, or permit authority. For questions about specific product documentation or configurations that fall outside standard EXAP ranges, the Metacon-Next team and its in-house R&D department can provide direct technical support.
Related Articles
- How do you use a fire door EPD in a sustainability assessment?
- What is the difference between a test report, classification report and EXAP report for fire doors?
- What information about fire-rated doors do insurers require for industrial projects?
- How does fire door width affect the required fire resistance class?